================================================================================
MANIFEST_5_HTML_TXT_COLLABTUNES_PHASE1_SAFE_BUILD_5_12_26.txt
ZIP: 5_HTML_TXT_COLLABTUNES_PHASE1_SAFE_BUILD_BOUNCER_PAGES_CHECKLIST_5_12_26.zip
Generated: 5.12.26 | Production Claude — Path C Safe Build
================================================================================

FILE COUNT: 5 (+ this manifest = 6 total in ZIP)

FILES:
  1. FRONT_DOOR_BOUNCER_FIXED_COLOR_V2_5_12_26.html
     Type: HTML — deployment-ready
     Status: BUILT — ready for Yola upload
     Fixes applied:
       FIX-01: ratings[4] → ratings[0] (default = G/PG)
       FIX-02: Profanity removed from all pre-selection states
     Verify in browser before deploying. See checklist Step 1.

  2. WEBSITE_MISSION_STATEMENT_5_12_26.html
     Type: HTML — deployment-ready (placeholder copy)
     Status: BUILT — structural template ready
     Rating: G
     URL target: /website-mission-statement/
     Note: Placeholder copy active. Tom input required for final copy.
     Flag: [NEEDS TOM INPUT — mission statement copy]

  3. PDF_LANDING_PAGE_DOWNLOAD_THE_BOOK_5_12_26.html
     Type: HTML — deployment-ready
     Status: BUILT — ready for Yola upload
     Rating: G
     URL target: /download-the-book/
     PDF link: confirmed from handoff docs

  4. REPOSITORY_FOLDER_STRUCTURE_REFERENCE_5_12_26.txt
     Type: TXT — implementation reference
     Status: READY TO IMPLEMENT
     Purpose: Directory tree with descriptions and filing rules

  5. PHASE1_SAFE_IMPLEMENTATION_CHECKLIST_5_12_26.txt
     Type: TXT — operational checklist
     Status: ACTIVE — use during Phase 1 execution
     Purpose: Ordered steps, rollback points, verification gates,
              checkpoint ZIP timing, hard-stop list

================================================================================
ACTIVE FLAGS (carried forward — not resolved in this build):
  [NEEDS TOM DECISION 01] X-rated nav handling (Option A/B/C)
  [NEEDS TOM DECISION 04] Revenue Streams destination URL
  [NEEDS TOM DECISION 06] Chapter drift fix (blocks Phase 2)
  [NEEDS TOM DECISION 07] Canonical ch.18
  [NEEDS TOM DECISION 09] Lady Weaver canonical URL
  [NEEDS TOM INPUT]       Bouncer subtitle final copy
  [NEEDS TOM INPUT]       Mission statement final copy
  [AWAITING FILE]         mood_settings_ratings_explicit
  [AWAITING FILE]         COLLABTUNES_LIVE_CAPTURE_FINAL_2026-05-12.zip
  [AWAITING CLEARANCE]    DEFAMATION_RISK_REGISTRY_VOL1 — blocks bulk generation

NEXT ACTION: Tom confirms Path A or B + provides Decision 01/04 answers.
             Production Claude executes Steps 3–7 of checklist.
================================================================================
END MANIFEST
================================================================================
